Construction Project Expertise
Comprehensive Project Consulting
Engineering and Technical Measures for Civil Protection
Energy Efficiency and Environmental Impact Assessment
Discuss your project, determine the scope of required work and set timelines
Based on initial data, create a commercial proposal with preliminary cost
You provide an entry letter for expertise and a questionnaire. We conduct an initial analysis for completeness and compliance
Agree on cooperation terms, final service cost, and timelines. Sign the contract
10-15 working days
Our experts thoroughly analyze your project on all necessary parameters.
Form a comprehensive expert conclusion. Sign the act of completed works.
Call us:
(067) 827 10 11To start working on the expertise of a design and engineering documentation, you need to draw up a contract for the work, fill out an application and a customer questionnaire. Contact us to determine the cost and timeline for passing the expertise.
The duration of the expertise depends on many factors, including:
1. Features of the object
The functional purpose of the building or structure. The class of consequences (CC1, CC2, CC3), which determines the complexity and responsibility of the object.
2. Need for additional sections development
In some cases, additional sections are required for the expertise that are not included in the main project but are mandatory according to the legislation. Such as:
The development of these sections takes additional time that needs to be considered when planning the project schedule.
3. Scope of documentation
The more materials need to be checked and assessed, the longer the expertise will take.
4. Complexity and specificity of the task
The more materials need to be checked and assessed, the longer the expertise will take.
The more materials need to be checked, the longer the expertise will take. For complex objects or structures with a high class of consequences, the expertise may take longer.
Estimated timelines:
The cost depends on:
1. The type of object.
2. The complexity of the task and the volume of documentation.
3. The urgency of completion.
To calculate the exact cost, please write to us or call for a consultation. Our specialists will review your task and offer the best cooperation option.
1. Compliance check with DBN
All project documentation must comply with the requirements of state building norms (DBN), particularly regarding composition and content. Check if it includes the textual part (explanatory notes, calculations) and graphic materials.
2. Analysis of graphic materials for compliance with DSTU
All drawings, schemes, and other graphic materials must be executed in accordance with DSTU standards. This ensures uniformity and correctness of data representation.
3. Consequence class calculation (responsibility)
Documents must include calculations of the class of consequences (CC1, CC2, CC3), which determine the level of responsibility of buildings or structures according to DBN B.1.2-14.
4. Technical and economic indicators (TEP)
Include the technical and economic indicators of the project: area, building volume, construction cost, work execution terms, etc. They are an important part of assessing the scale and economic feasibility.
5. Title documents
For land plots - cadastral number, ownership or use acts.
For buildings or structures - technical passport, ownership documents.
6. Additional documents depending on the task
For example, inspection acts, photo/video materials of the object's condition, subcontract agreements, or insurance contracts.
If you have doubts about the compliance of your documents with the requirements, contact our specialists - we will help assess their quality and suggest what needs to be improved.
We have been cooperating for more than four years in various directions both in the development of individual sections of project documentation and especially productively in engineering and consulting services for the expertise of project documentation. Recently, we concluded several new agreements for the development of PSH, EIA, and energy saving. I think, as always, the work will be done on time and with high quality, and I am confident that there will be no problems with passing independent expertise. I highly recommend cooperating with such specialists as National Construction Expertise - you won't have any troubles at any stage.
We work on a permanent basis in the development of ETMCP and evacuation calculations. You can say that National Construction Expertise is our permanent partner. Everything is as they declare - 30 days and it's ready, although with us it is much faster, the main thing is to provide the initial data on time. I highly recommend their work on consulting regarding passing expertise: everything is clear and with the documentation list, and resolving comments, they will guide you from start to finish.
We are very satisfied regarding our cooperation with NBE, especially with the management. A project manager was in constant contact with us and handled all issues. The quality of services is absolutely satisfactory, the project of the construction organization was executed very well with a deep knowledge of details, which allowed us to quickly complete the PPW and save money.
LLC "Rose Industries" expresses its gratitude to LLC "National Construction Expertise" and all the company's specialists for their work in developing specific sections of the project documentation and obtaining a positive conclusion from the expert institution. All services were completed within the contractual deadlines and to a high standard. We would especially like to highlight the high level of professionalism, promptness, and attentiveness to the Client's wishes, which made the work productive and efficient.
"National Construction Expertise" provided advisory regulatory and technical expertise of design documentation for the construction project "Reconstruction of the compressor station "Bar" of the "Soyuz" gas pipeline, Barsky district of Vinnytsia region" for the German company Ferrostaal Industrienlagen GmbH (General Contractor for the reconstruction of the "Bar" CS).
LLC "National Construction Expertise" has qualified responsible experts in its staff who have the necessary qualification certificates confirming their ability to perform work on the expertise of design documentation for construction in relevant areas, as well as expert specialists who, under the guidance of responsible experts, conducted expertise in the relevant area, of individual sections and parts of the design documentation for construction.
The services were provided qualitatively and in full, with the necessary recommendations regarding the design documentation for the construction project "Reconstruction of the compressor station "Bar" of the "Soyuz" gas pipeline, Barsky district of Vinnytsia region."
The project solutions involve the replacement of 2 existing gas pumping units with new PGT-25-DLE units with a capacity of 25 MW each and the use of 2 existing GTK-10-1 units, reconstruction of the fuel gas preparation unit and measurement nodes, gas piping of compressors, buildings, automation systems, power supply, heat supply, heating, and ventilation.
Productivity of the CS is 85 million m³/day.
Service provision start date - May 2020.
Service provision end date - July 2020.